Commercial, Condo and Multi-Family Re-Cladding

Commercial and multi-family siding for Calgary condo boards, property managers and building owners. We re-clad townhouse complexes, low-rise condos, retail and commercial bays in Hardie board, aluminum or steel, in planned phases, to the design professional’s specification.

A three-storey townhouse block under re-cladding, with scaffolding along the front, one end finished in new grey lap siding and the rest in house wrap.

The Problem It Solves

Re-cladding a multi-family or commercial building is a different job from re-siding a house, even when the siding is the same product. The client is a board, a property manager or an owner answering to tenants. Walls are longer and taller, and people live or trade behind every one of them while the work goes on. Parking, balconies, patios, storefronts and exits have to stay usable. A townhouse complex hit by hail may have dozens of units with different damage on different elevations, and a retail strip can’t lose its entrances and signage for a week without its tenants feeling it.

The regulatory side is heavier too. The building code puts buildings of three storeys or less, with a building area not exceeding 600 square metres, in residential, business, mercantile and some industrial occupancies under Part 9. Larger buildings, and some occupancies, fall under Part 3. On Part 3 buildings the cladding choice is tied to the building’s construction type and fire separations, and a design professional sets the specification. Manufacturers add their own limits: the Canadian product evaluation for James Hardie cladding requires design by a professional engineer on buildings higher than 12 m or outside Part 9.

For condominium corporations the question arrives with a budget attached. Alberta’s Condominium Property Regulation requires a reserve fund study that inventories depreciating property likely to need repair or replacement within the next 30 years or longer, based on an on-site visual inspection, and a new study within five years of the most recent approved plan. Cladding is one of the larger items in that inventory. Boards need a scope they can compare against the study, tender fairly and explain to owners, not a sales quote for a site-wide replacement nobody planned for.

How It Works

We work to the specification rather than inventing one. On Part 3 buildings and larger Part 9 projects, an architect, engineer or building envelope consultant usually defines the wall assembly, and our role is to build it accurately, flag site conditions that don’t match the drawings, and document what went in. On a smaller Part 9 complex with no consultant, we scope the wall as we would a house, from membrane and flashing to clearances, and recommend bringing one in if the damage or the building calls for it. James Hardie fibre cement, steel and Longboard aluminum are all stated as non-combustible, which helps where the code requires it, but whether a wall requires it is determined for that building.

Phasing keeps the work livable. The site is divided into elevations, blocks or buildings, and each phase is opened, repaired, membraned and closed before the next begins, so no wall sits exposed longer than it must. That is a technical point as well as a courtesy: the CCMC evaluation for Tyvek CommercialWrap requires the membrane to be protected from UV exposure within 60 days, so a phase can’t be wrapped and left while crews move across the site. Written notice to residents before work reaches their elevation, and progress reports with photos of each phase before it is closed, are worth writing into the contract.

How the Job Runs, Step by Step

1

Review the documents

We read the reserve fund study, any envelope condition assessment, the drawings and the consultant’s specification, then walk the site with the board or manager. Differences between the documents and the walls on site are raised in writing before pricing.

2

Confirm code path and approvals

We confirm whether the building is Part 9 or Part 3, who the design professional is, and what the municipality requires. Cochrane, for example, lists new cladding on existing commercial buildings as permit work; other municipalities set their own requirements.

3

Plan phases and notices

Phases are set around the building layout, weather, access and membrane exposure limits. A notice schedule should be agreed with the board or manager so residents and tenants know when their elevation is affected and what they need to move.

4

Build each phase to spec

Every phase follows one sequence: remove cladding, inspect and repair sheathing, install membrane and flashings, add furring and fire blocking where the assembly calls for it, then cladding and trim. James Hardie’s cutting guidance favours dust collection, which matters beside occupied units.

5

Review and close out

Each phase is reviewed with the consultant or manager before the next opens. At completion the board should receive photos, product information and installation references, which are useful to the next reserve fund study provider.

What Decides the Specification

Fire requirements drive material choice first, then durability and budget. In Part 3, Table 3.2.3.7. of the NBC(AE) sets minimum construction for exposing building faces, and where it calls for non-combustible cladding, that requirement can in some cases be waived for wall assemblies that comply through routes including the CAN/ULC-S134 fire test. That is a design decision for the professional of record, never a substitution made on site. On Part 9 townhouses, walls close to a property line bring limiting distance rules that restrict cladding choices. HardiePlank’s Canadian instructions allow a maximum mean roof height of 25.9 m, and steel and aluminum claddings each carry their own thickness standard.

On long walls, movement and detailing drive the rest. James Hardie asks designers of large walls to consider thermal expansion and moisture movement. Wide flat metal panels can show oil canning, a cosmetic waviness that flat, true furring, correct fastener torque, narrower flats or stiffening ribs, and room for thermal movement all reduce, though no one can promise its complete absence. Locked-seam metal siding is treated as face-sealed under the code, but we still install a sheathing membrane behind it as practice. Concealed air spaces deeper than 25 mm need fire blocking, which affects how rain screen furring is laid out.

Alberta Code Notes

Alberta currently enforces the National Building Code – 2023 Alberta Edition, which applies to alterations of existing buildings as well as new construction. Part 3 governs larger multi-family, mixed-use and commercial buildings, and the NBC(AE) names CAN/ULC-S134, the standard method of fire test of exterior wall assemblies, as the assembly test referenced for cladding. Permit requirements for re-cladding are set locally: the Town of Cochrane’s permit information lists installation of new cladding on existing commercial buildings among projects that require a permit. In Calgary, Airdrie, Okotoks and Chestermere we confirm requirements with the authority having jurisdiction at the scoping stage, before a phase plan is fixed.

General guidance only. The authority having jurisdiction and the product’s own evaluation report decide what applies to your job.

Around Calgary

Calgary’s major hailstorms hit multi-family and commercial buildings along with houses. The June 2020 storm’s core damage zone lay just east of the airport in northeast Calgary, where reporting described hail peeling siding off houses and businesses in communities such as Taradale and Martindale, and the August 2024 storm damaged buildings across northern Calgary, including Redstone. Townhouse complexes built through the 2000s in the northeast and southeast suburbs tend to carry the same builder vinyl as the detached houses around them, and a hail claim or a reserve fund study update is often what prompts a board to ask whether that vinyl should go back on or be replaced with something tougher.

Commercial & Multi-Family: Questions We Get

Can you work while residents are living in the building?
Yes, that is the normal situation on condo and townhouse projects. Phasing keeps the open area small, each phase is closed before the next starts, and residents should get notice before work reaches their elevation, covering dates, balcony and window access, parking and anything they need to move. Dust and access near entries are managed phase by phase, and fibre cement should be cut with dust collection, as James Hardie recommends, when crews work beside occupied units.
Does our building need non-combustible cladding?
It depends on the building. Part 3 buildings follow Table 3.2.3.7. of the NBC(AE), which can call for non-combustible cladding on exposing building faces, with a CAN/ULC-S134 assembly route available in some cases. Part 9 townhouses near property lines have their own limiting distance rules. The answer comes from your design professional or the municipality reviewing that building, and we build to it. Fibre cement and metal claddings keep the options open.
How do you use our reserve fund study?
Alberta condominium corporations must have a reserve fund study that inventories depreciating property, including cladding, and must renew it within five years of the most recent approved plan. We read the study’s cladding components and condition notes, then walk the site to check them against the walls. Our scope is organized so the board can compare it line by line with the study and phase the work to match available funds.
Will you work with our engineer or envelope consultant?
Yes. On larger buildings, and on James Hardie cladding above 12 m or outside Part 9, an engineer’s cladding design is required, and envelope consultants often write the specification and review the work. We price to their documents, raise conflicts in writing, give access for their field reviews at each phase, and supply photos and product records. If you don’t have a consultant and the building suggests you need one, we will tell you.
Do I need a permit to replace my siding?
It depends on the job, and the municipality decides: the City of Calgary, the Town of Okotoks, the City of Airdrie, the Town of Cochrane or the City of Chestermere. Under Alberta’s Permit Regulation, replacing siding with a similar type of siding, for maintenance or appearance and with no structural change, is generally exempt from a building permit. Changing the cladding type, adding exterior insulation, altering openings or repairing structure can take a project outside that exemption. We confirm with the municipality before work starts.