Condominium boards, property managers and reserve fund planners

Cladding Replacement Planning for Condo Corporations

For a condominium corporation, exterior cladding should not be a surprise expense. It is a depreciating component in the reserve fund study, and Alberta’s Condominium Property Regulation requires a new study and reserve fund plan on or before five years from the last approved plan. The hard part is turning a line in that study into a scope the board can approve, tender and pay for without draining the fund in one year.

We work with condo boards and property managers on siding replacement, hail restoration and rot repair on townhouse complexes and low-rise buildings around Calgary. The aim is a written scope that owners and the board can understand, a phasing plan tied to the reserve fund, and a job run while residents go on living in their homes.

Scopes written for tenders

A scope that names the cladding, membrane, flashing and trim details, the tear-off, and how concealed damage will be priced lets you compare bids on the same basis. We can write it against the component list in your reserve fund study, so the work lines up with how the board already plans.

Phasing by building or elevation

Few corporations can fund an entire complex at once. Splitting the work by building, block or elevation spreads the cost across fiscal years, and starting with the walls in the worst condition protects the rest of the complex while the fund catches up.

Condition found, not assumed

Sheathing rot behind siding usually traces back to specific details: roof-to-wall kickouts, window flashing, decks and patios draining against the wall. Opening test areas before a full tender tells the board how much concealed damage to expect, rather than meeting it halfway through the job.

Resident notices and access

Residents need to know when scaffolding goes up, which patios and parking spots are affected, and when windows will be covered. Notice wording for the property manager to send, and access planned so homes stay usable while their walls are worked on, belong in the plan from the start.

Progress reporting

Regular updates to the manager or board should cover the elevations completed, concealed damage found and how it was priced, photos of membrane and flashing before cover, and anything that affects the schedule or budget, so the people who approve decisions have the facts in front of them.

The right specification for the building

Buildings over three storeys, or over 600 m² in building area, fall outside Part 9 of the building code, and there a design professional sets the cladding specification. Walls close to a property line may be limited in what cladding they can carry. We confirm which applies before recommending a material.

How we work with a board or manager

  • A site walk with the property manager, and a look at the reserve fund study’s cladding components and any building envelope reports
  • Test openings where concealed damage is suspected, so the scope reflects what is behind the siding
  • A written scope and phasing plan the board can approve, budget and put out to tender
  • Permit and specification questions confirmed with the municipality, and with the design professional on larger buildings
  • Resident notices and access planned with the manager as part of the phasing plan, and a single point of contact during the work
  • Progress reporting and a close-out package for the corporation’s records, agreed with the board at the start
A row of two-storey townhouses finished in new grey and white lap and panel siding, along a shared driveway.
A townhouse complex with new cladding

Condo Boards & Property Managers: Questions

Can the work be spread over several budget years?
On most complexes it should be. We phase by building, block or elevation, starting where condition is worst, and price each phase separately so the board can match the work to the reserve fund plan. Product and colour availability are confirmed at the start, because a profile that is discontinued between phases would leave the complex looking mismatched.
How do you handle concealed damage on a fixed-price tender?
The scope states how concealed damage such as rotted sheathing will be measured and priced, usually as a unit rate, so base prices stay comparable between bidders. Test openings before the tender reduce the unknowns. The scope should also require every repair to be photographed and reported before it is covered, so the manager can see what was found and approve it.
Do residents need to move out while the siding is replaced?
Generally no. Residents stay in their homes while the walls are worked on. They will need to clear patios and the area along the walls, expect noise during working hours, and may lose a parking spot or patio use for a period. We plan the sequence with the property manager so notices go out with enough warning.

Is cladding coming due in your reserve fund study?

Send the study’s cladding components or book a site walk, and we will help turn them into a scope and phasing plan the board can act on.